Description of the power plant
Ground-based solar power plant Boryslavska PV Plant №2 is located in west part of Ukraine - Boryslavska city council, Lvivska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 0.33 MW. Ltd "Syntez Solar" is a legal entity operating the power plant. It obtained the license for electricity generation on December 15, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.99 eurocents starting from December 15, 2016.
Putted into opperation
Nov 2016
Installed capacity
0.33 MW
DCFeed-in-Tariff
15.99¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VSEM"General contractor
PE TYUVYKEquipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Yingli Solar | Polv Module YL310P-3b | |||
SMA | Sunny TriPower (STP) 25000 TL |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Boryslavska PV Plant №2?
- What group of companies does the Boryslavska PV Plant №2 belong to?
- Who are the beneficial owners of Boryslavska PV Plant №2?
- What is the insolation at Boryslavska PV Plant №2?
- What is the current tariff in UAH for Boryslavska PV Plant №2?
- Is there a local component bonus for Boryslavska PV Plant №2 and what is its size
- What is the capacity factor of Boryslavska PV Plant №2?
- What is the monthly electricity production of Boryslavska PV Plant №2?
- What is the annual revenue of Boryslavska PV Plant №2?
- What market share does Boryslavska PV Plant №2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Boryslavska PV Plant №2?
- Which company designed the project for Boryslavska PV Plant №2?
- Which company was the general contractor for Boryslavska PV Plant №2?
- What generating equipment (solar panels and inverters) is installed in Boryslavska PV Plant №2?
- What is the size of the land plot on which Boryslavska PV Plant №2 is located?
- What are the cadastral numbers of the parcels on which Boryslavska PV Plant №2 is located?
- What are the exact coordinates of the location of Boryslavska PV Plant №2?
- When were the grid connection specification forBoryslavska PV Plant №2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Boryslavska PV Plant №2
- Land allocation documentationBoryslavska PV Plant №2
- Construction permits and declarative documentationBoryslavska PV Plant №2
- Environmental Impact Assessment (EIA) DocumentsBoryslavska PV Plant №2
- Feed-In-Tariff Setting DocumentsBoryslavska PV Plant №2
The presented list reflects the directions in which information on assets is collected. On the Boryslavska PV Plant №2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.