Description of the power plant
Onshore wind farm Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase is located in south part of Ukraine - Chaplynskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 31.2 MW. Ltd "Syvashenerhoprom" is a legal entity operating the power plant. It obtained the license for electricity generation on July 12, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 8.82 eurocents starting from April 14, 2021.
Putted into opperation
Mar 2021
Installed capacity
31.2 MW
Feed-in-Tariff
8.82¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
TOV" VKN UKRAYINA"General contractor
POWER CONSTRUCTION CORPORATION OF CHINA, LTDAdditional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What group of companies does the Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase belong to?
- Who are the beneficial owners of Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What is the wind speed at Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What is the current tariff in UAH for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- Is there a local component bonus for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase and what is its size
- What is the capacity factor of Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What is the monthly electricity production of Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What is the annual revenue of Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What market share does Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- Which company designed the project for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- Which company was the general contractor for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What generating equipment (wind turbines) is installed in Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- What is the size of the land plot on which Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase is located?
- What are the cadastral numbers of the parcels on which Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase is located?
- What are the exact coordinates of the location of Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase?
- When were the grid connection specification forSyvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase
- Land allocation documentationSyvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase
- Construction permits and declarative documentationSyvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase
- Environmental Impact Assessment (EIA) DocumentsSyvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase
- Feed-In-Tariff Setting DocumentsSyvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase
The presented list reflects the directions in which information on assets is collected. On the Syvaska Wind Farm 1 Stage 6 Phase & 2 Stage 9 Phase some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.