Description of the power plant
Biogas power plant Ustanovka Koheneratsiy̆na Blochna Kub 604318 is located in east part of Ukraine - Novomoskovskyi district, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 3.6 MW. Ltd "Pf "Lotus" is a legal entity operating the power plant. It obtained the license for electricity generation on November 24, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from March 16, 2017.
Putted into opperation
Jan 2017
Installed capacity
3.6 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "PF "LOTUS"General contractor
LTD "PF "LOTUS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What group of companies does the Ustanovka Koheneratsiy̆na Blochna Kub 604318 belong to?
- Who are the beneficial owners of Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What is the current tariff in UAH for Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- Is there a local component bonus for Ustanovka Koheneratsiy̆na Blochna Kub 604318 and what is its size
- What is the capacity factor of Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What is the monthly electricity production of Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What is the annual revenue of Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What market share does Ustanovka Koheneratsiy̆na Blochna Kub 604318 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- Which company designed the project for Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- Which company was the general contractor for Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- What is the size of the land plot on which Ustanovka Koheneratsiy̆na Blochna Kub 604318 is located?
- What are the cadastral numbers of the parcels on which Ustanovka Koheneratsiy̆na Blochna Kub 604318 is located?
- What are the exact coordinates of the location of Ustanovka Koheneratsiy̆na Blochna Kub 604318?
- When were the grid connection specification forUstanovka Koheneratsiy̆na Blochna Kub 604318 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Ustanovka Koheneratsiy̆na Blochna Kub 604318
- Land allocation documentationUstanovka Koheneratsiy̆na Blochna Kub 604318
- Construction permits and declarative documentationUstanovka Koheneratsiy̆na Blochna Kub 604318
- Environmental Impact Assessment (EIA) DocumentsUstanovka Koheneratsiy̆na Blochna Kub 604318
- Feed-In-Tariff Setting DocumentsUstanovka Koheneratsiy̆na Blochna Kub 604318
The presented list reflects the directions in which information on assets is collected. On the Ustanovka Koheneratsiy̆na Blochna Kub 604318 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.