Description of the power plant
Rooftop solar power plant 1 And 2 Stages Studenykivskoyi PV Plant is located in north part of Ukraine - Pereiaslav-Khmelnytska city council, Kyivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 12.41 MW. Ltd "Studenykivska Fes" is a legal entity operating the power plant. It obtained the license for electricity generation on January 11, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 16.37 eurocents starting from March 19, 2019.
Putted into opperation
Jan 2019
Installed capacity
12.41 MW
DCFeed-in-Tariff
16.37¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
General contractor
LTD "FES"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with 1 And 2 Stages Studenykivskoyi PV Plant?
- What group of companies does the 1 And 2 Stages Studenykivskoyi PV Plant belong to?
- Who are the beneficial owners of 1 And 2 Stages Studenykivskoyi PV Plant?
- What is the insolation at 1 And 2 Stages Studenykivskoyi PV Plant?
- What is the current tariff in UAH for 1 And 2 Stages Studenykivskoyi PV Plant?
- Is there a local component bonus for 1 And 2 Stages Studenykivskoyi PV Plant and what is its size
- What is the capacity factor of 1 And 2 Stages Studenykivskoyi PV Plant?
- What is the monthly electricity production of 1 And 2 Stages Studenykivskoyi PV Plant?
- What is the annual revenue of 1 And 2 Stages Studenykivskoyi PV Plant?
- What market share does 1 And 2 Stages Studenykivskoyi PV Plant have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for 1 And 2 Stages Studenykivskoyi PV Plant?
- Which company designed the project for 1 And 2 Stages Studenykivskoyi PV Plant?
- Which company was the general contractor for 1 And 2 Stages Studenykivskoyi PV Plant?
- What generating equipment (solar panels and inverters) is installed in 1 And 2 Stages Studenykivskoyi PV Plant?
- What is the size of the land plot on which 1 And 2 Stages Studenykivskoyi PV Plant is located?
- What are the cadastral numbers of the parcels on which 1 And 2 Stages Studenykivskoyi PV Plant is located?
- What are the exact coordinates of the location of 1 And 2 Stages Studenykivskoyi PV Plant?
- When were the grid connection specification for1 And 2 Stages Studenykivskoyi PV Plant issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for 1 And 2 Stages Studenykivskoyi PV Plant
- Land allocation documentation1 And 2 Stages Studenykivskoyi PV Plant
- Construction permits and declarative documentation1 And 2 Stages Studenykivskoyi PV Plant
- Environmental Impact Assessment (EIA) Documents1 And 2 Stages Studenykivskoyi PV Plant
- Feed-In-Tariff Setting Documents1 And 2 Stages Studenykivskoyi PV Plant
The presented list reflects the directions in which information on assets is collected. On the 1 And 2 Stages Studenykivskoyi PV Plant some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?