Onshore wind farm 2 7 Stages Over’yanivskoyi Wind Farm is located in south part of Ukraine - Novotroitskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 64.8 MW. Ltd "Vku" is a legal entity operating the power plant. It obtained the license for electricity generation on November 17, 2011 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.18 eurocents starting from March 19, 2019.
Putted into opperation
Feb 2019
Installed capacity
64.8 MW
Feed-in-Tariff
10.18¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "VKU"General contractor
LTD "KBMP "DEMOS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with 2 7 Stages Over’yanivskoyi Wind Farm?
- What group of companies does the 2 7 Stages Over’yanivskoyi Wind Farm belong to?
- Who are the beneficial owners of 2 7 Stages Over’yanivskoyi Wind Farm?
- What is the wind speed at 2 7 Stages Over’yanivskoyi Wind Farm?
- What is the current tariff in UAH for 2 7 Stages Over’yanivskoyi Wind Farm?
- Is there a local component bonus for 2 7 Stages Over’yanivskoyi Wind Farm and what is its size
- What is the capacity factor of 2 7 Stages Over’yanivskoyi Wind Farm?
- What is the monthly electricity production of 2 7 Stages Over’yanivskoyi Wind Farm?
- What is the annual revenue of 2 7 Stages Over’yanivskoyi Wind Farm?
- What market share does 2 7 Stages Over’yanivskoyi Wind Farm have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for 2 7 Stages Over’yanivskoyi Wind Farm?
- Which company designed the project for 2 7 Stages Over’yanivskoyi Wind Farm?
- Which company was the general contractor for 2 7 Stages Over’yanivskoyi Wind Farm?
- What generating equipment (wind turbines) is installed in 2 7 Stages Over’yanivskoyi Wind Farm?
- What is the size of the land plot on which 2 7 Stages Over’yanivskoyi Wind Farm is located?
- What are the cadastral numbers of the parcels on which 2 7 Stages Over’yanivskoyi Wind Farm is located?
- What are the exact coordinates of the location of 2 7 Stages Over’yanivskoyi Wind Farm?
- When were the grid connection specification for2 7 Stages Over’yanivskoyi Wind Farm issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for 2 7 Stages Over’yanivskoyi Wind Farm
- Land allocation documentation2 7 Stages Over’yanivskoyi Wind Farm
- Construction permits and declarative documentation2 7 Stages Over’yanivskoyi Wind Farm
- Environmental Impact Assessment (EIA) Documents2 7 Stages Over’yanivskoyi Wind Farm
- Feed-In-Tariff Setting Documents2 7 Stages Over’yanivskoyi Wind Farm
The presented list reflects the directions in which information on assets is collected. On the 2 7 Stages Over’yanivskoyi Wind Farm some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.