Description of the power plant
Biogas power plant Bioes Yuzefo Mykolayivska is located in east part of Ukraine - Koziatynskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 5.2 MW. Ltd "Yu-M Bhk" is a legal entity operating the power plant. It obtained the license for electricity generation on March 29, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from July 30, 2019.
Putted into opperation
May 2019
Installed capacity
5.2 MW
Feed-in-Tariff
12.39¢
+10% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC taking into account the premium for the local component - 10%
(eurocents/KWh)
Contractors
Designer
PJSC "SUMSKYY PROMPROEKT"General contractor
PJSC "UTK"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Caterpillar | CG 170-12 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Bioes Yuzefo Mykolayivska?
- What group of companies does the Bioes Yuzefo Mykolayivska belong to?
- Who are the beneficial owners of Bioes Yuzefo Mykolayivska?
- What is the current tariff in UAH for Bioes Yuzefo Mykolayivska?
- Is there a local component bonus for Bioes Yuzefo Mykolayivska and what is its size
- What is the capacity factor of Bioes Yuzefo Mykolayivska?
- What is the monthly electricity production of Bioes Yuzefo Mykolayivska?
- What is the annual revenue of Bioes Yuzefo Mykolayivska?
- What market share does Bioes Yuzefo Mykolayivska have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Bioes Yuzefo Mykolayivska?
- Which company designed the project for Bioes Yuzefo Mykolayivska?
- Which company was the general contractor for Bioes Yuzefo Mykolayivska?
- What is the size of the land plot on which Bioes Yuzefo Mykolayivska is located?
- What are the cadastral numbers of the parcels on which Bioes Yuzefo Mykolayivska is located?
- What are the exact coordinates of the location of Bioes Yuzefo Mykolayivska?
- When were the grid connection specification forBioes Yuzefo Mykolayivska issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Bioes Yuzefo Mykolayivska
- Land allocation documentationBioes Yuzefo Mykolayivska
- Construction permits and declarative documentationBioes Yuzefo Mykolayivska
- Environmental Impact Assessment (EIA) DocumentsBioes Yuzefo Mykolayivska
- Feed-In-Tariff Setting DocumentsBioes Yuzefo Mykolayivska
The presented list reflects the directions in which information on assets is collected. On the Bioes Yuzefo Mykolayivska some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.