Description of the power plant
Biogas power plant Biogas Unit Kliar Enerdzhi Kherson 2 is located in east part of Ukraine - Kryvorizka city council, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 0.66 MW. Ltd "Kliar Enerdzhi-Kherson" is a legal entity operating the power plant. It obtained the license for electricity generation on November 08, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from May 17, 2019.
From May 2019 Cogeneration Unit Valyavko Pivdenna was changed to Biogas Unit Kliar Enerdzhi Kherson 2
Putted into opperation
Jul 2017
Installed capacity
0.66 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "INZHTEK"General contractor
LTD "DZHI ES SERVIS"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
GE Jenbacher | JMC 412 GS-B.L. |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Biogas Unit Kliar Enerdzhi Kherson 2?
- What group of companies does the Biogas Unit Kliar Enerdzhi Kherson 2 belong to?
- Who are the beneficial owners of Biogas Unit Kliar Enerdzhi Kherson 2?
- What is the current tariff in UAH for Biogas Unit Kliar Enerdzhi Kherson 2?
- Is there a local component bonus for Biogas Unit Kliar Enerdzhi Kherson 2 and what is its size
- What is the capacity factor of Biogas Unit Kliar Enerdzhi Kherson 2?
- What is the monthly electricity production of Biogas Unit Kliar Enerdzhi Kherson 2?
- What is the annual revenue of Biogas Unit Kliar Enerdzhi Kherson 2?
- What market share does Biogas Unit Kliar Enerdzhi Kherson 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Biogas Unit Kliar Enerdzhi Kherson 2?
- Which company designed the project for Biogas Unit Kliar Enerdzhi Kherson 2?
- Which company was the general contractor for Biogas Unit Kliar Enerdzhi Kherson 2?
- What is the size of the land plot on which Biogas Unit Kliar Enerdzhi Kherson 2 is located?
- What are the cadastral numbers of the parcels on which Biogas Unit Kliar Enerdzhi Kherson 2 is located?
- What are the exact coordinates of the location of Biogas Unit Kliar Enerdzhi Kherson 2?
- When were the grid connection specification forBiogas Unit Kliar Enerdzhi Kherson 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Biogas Unit Kliar Enerdzhi Kherson 2
- Land allocation documentationBiogas Unit Kliar Enerdzhi Kherson 2
- Construction permits and declarative documentationBiogas Unit Kliar Enerdzhi Kherson 2
- Environmental Impact Assessment (EIA) DocumentsBiogas Unit Kliar Enerdzhi Kherson 2
- Feed-In-Tariff Setting DocumentsBiogas Unit Kliar Enerdzhi Kherson 2
The presented list reflects the directions in which information on assets is collected. On the Biogas Unit Kliar Enerdzhi Kherson 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.