Description of the power plant
Biogas power plant Biotpp Af Chkalova 1 Stage is located in east part of Ukraine - Novomyrhorodskyi district, Kirovohradska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 6.0 MW. Tov "Ahrofirma Im. Chkalova" is a legal entity operating the power plant. It obtained the license for electricity generation on May 27, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from August 05, 2020.
Putted into opperation
Jul 2020
Installed capacity
6.0 MW
Feed-in-Tariff
12.39¢
+500% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC taking into account the premium for the local component - 500%
(eurocents/KWh)
Contractors
Designer
LTD "PVI "MYKOLAYIVAHROPROEKT"General contractor
LTD MONOLIT KHOLDYNH PROMBUDAdditional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Biotpp Af Chkalova 1 Stage?
- What group of companies does the Biotpp Af Chkalova 1 Stage belong to?
- Who are the beneficial owners of Biotpp Af Chkalova 1 Stage?
- What is the current tariff in UAH for Biotpp Af Chkalova 1 Stage?
- Is there a local component bonus for Biotpp Af Chkalova 1 Stage and what is its size
- What is the capacity factor of Biotpp Af Chkalova 1 Stage?
- What is the monthly electricity production of Biotpp Af Chkalova 1 Stage?
- What is the annual revenue of Biotpp Af Chkalova 1 Stage?
- What market share does Biotpp Af Chkalova 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Biotpp Af Chkalova 1 Stage?
- Which company designed the project for Biotpp Af Chkalova 1 Stage?
- Which company was the general contractor for Biotpp Af Chkalova 1 Stage?
- What is the size of the land plot on which Biotpp Af Chkalova 1 Stage is located?
- What are the cadastral numbers of the parcels on which Biotpp Af Chkalova 1 Stage is located?
- What are the exact coordinates of the location of Biotpp Af Chkalova 1 Stage?
- When were the grid connection specification forBiotpp Af Chkalova 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Biotpp Af Chkalova 1 Stage
- Land allocation documentationBiotpp Af Chkalova 1 Stage
- Construction permits and declarative documentationBiotpp Af Chkalova 1 Stage
- Environmental Impact Assessment (EIA) DocumentsBiotpp Af Chkalova 1 Stage
- Feed-In-Tariff Setting DocumentsBiotpp Af Chkalova 1 Stage
The presented list reflects the directions in which information on assets is collected. On the Biotpp Af Chkalova 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.