Description of the power plant

Biomass power plant Biotpp Bandurskyy Oez is located in south part of Ukraine - Pervomaiskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 13.69 MW. Ltd "Bandurskyy Oliynoekstraktsiynyy Zavod" is a legal entity operating the power plant. It obtained the license for electricity generation on September 22, 2021 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from September 22, 2021.

LTD "BANDURSKYY OLIYNOEKSTRAKTSIYNYY ZAVOD"

Putted into opperation

May 2021

Installed capacity

13.69 MW

Feed-in-Tariff

12.39¢

Location

Pervomaiskyi district, Mykolaivska region, Ukraine

Key Indicators

N/A

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

13.685

Installed capacity

Installed capacity of the power plant (MW)

12.39

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

General contractor

LTD METALURGBUD

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for Biotpp Bandurskyy Oez

The presented list reflects the directions in which information on assets is collected. On the Biotpp Bandurskyy Oez some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001