Description of the power plant
Biomass power plant Biotpp Podilska is located in east part of Ukraine - Ovrutskyi district, Zhytomyrska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 5.9 MW. Ltd "Poliska Tes" is a legal entity operating the power plant. It obtained the license for electricity generation on July 12, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from December 13, 2019.
Putted into opperation
Oct 2019
Installed capacity
5.9 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "NTK "METROPOLIYA"General contractor
LTD "NTK "METROPOLIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Biotpp Podilska?
- What group of companies does the Biotpp Podilska belong to?
- Who are the beneficial owners of Biotpp Podilska?
- What is the current tariff in UAH for Biotpp Podilska?
- Is there a local component bonus for Biotpp Podilska and what is its size
- What is the capacity factor of Biotpp Podilska?
- What is the monthly electricity production of Biotpp Podilska?
- What is the annual revenue of Biotpp Podilska?
- What market share does Biotpp Podilska have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Biotpp Podilska?
- Which company designed the project for Biotpp Podilska?
- Which company was the general contractor for Biotpp Podilska?
- What is the size of the land plot on which Biotpp Podilska is located?
- What are the cadastral numbers of the parcels on which Biotpp Podilska is located?
- What are the exact coordinates of the location of Biotpp Podilska?
- When were the grid connection specification forBiotpp Podilska issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Biotpp Podilska
- Land allocation documentationBiotpp Podilska
- Construction permits and declarative documentationBiotpp Podilska
- Environmental Impact Assessment (EIA) DocumentsBiotpp Podilska
- Feed-In-Tariff Setting DocumentsBiotpp Podilska
The presented list reflects the directions in which information on assets is collected. On the Biotpp Podilska some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.