Description of the power plant
Biogas power plant Block Modular PP Stadnytsya is located in east part of Ukraine - Vinnytskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2014 with installed capacity- 1.0 MW. Ltd "Aeu Enerho" is a legal entity operating the power plant. It obtained the license for electricity generation on April 23, 2015 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from November 26, 2015.
Putted into opperation
Dec 2014
Installed capacity
1.0 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
CG 734 F2 1460 кВА | ||||
GE Jenbacher | JMC 320 GS-B.L. |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Block Modular PP Stadnytsya?
- What group of companies does the Block Modular PP Stadnytsya belong to?
- Who are the beneficial owners of Block Modular PP Stadnytsya?
- What is the current tariff in UAH for Block Modular PP Stadnytsya?
- Is there a local component bonus for Block Modular PP Stadnytsya and what is its size
- What is the capacity factor of Block Modular PP Stadnytsya?
- What is the monthly electricity production of Block Modular PP Stadnytsya?
- What is the annual revenue of Block Modular PP Stadnytsya?
- What market share does Block Modular PP Stadnytsya have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Block Modular PP Stadnytsya?
- Which company designed the project for Block Modular PP Stadnytsya?
- Which company was the general contractor for Block Modular PP Stadnytsya?
- What is the size of the land plot on which Block Modular PP Stadnytsya is located?
- What are the cadastral numbers of the parcels on which Block Modular PP Stadnytsya is located?
- What are the exact coordinates of the location of Block Modular PP Stadnytsya?
- When were the grid connection specification forBlock Modular PP Stadnytsya issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Block Modular PP Stadnytsya
- Land allocation documentationBlock Modular PP Stadnytsya
- Construction permits and declarative documentationBlock Modular PP Stadnytsya
- Environmental Impact Assessment (EIA) DocumentsBlock Modular PP Stadnytsya
- Feed-In-Tariff Setting DocumentsBlock Modular PP Stadnytsya
The presented list reflects the directions in which information on assets is collected. On the Block Modular PP Stadnytsya some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.