Description of the power plant
Onshore wind farm Botiyivska Wind Farm is located in south part of Ukraine - Prymorskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2015 with installed capacity- 199.88 MW. Ltd «Dtek Botiyevska Ves» is a legal entity operating the power plant. It obtained the license for electricity generation on December 06, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.31 eurocents starting from December 13, 2012.
Putted into opperation
Oct 2015
Installed capacity
199.9 MW
Feed-in-Tariff
11.31¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD TPF "DONTEKHPROM"General contractor
LTD "BK "VIRA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Botiyivska Wind Farm?
- What group of companies does the Botiyivska Wind Farm belong to?
- Who are the beneficial owners of Botiyivska Wind Farm?
- What is the wind speed at Botiyivska Wind Farm?
- What is the current tariff in UAH for Botiyivska Wind Farm?
- Is there a local component bonus for Botiyivska Wind Farm and what is its size
- What is the capacity factor of Botiyivska Wind Farm?
- What is the monthly electricity production of Botiyivska Wind Farm?
- What is the annual revenue of Botiyivska Wind Farm?
- What market share does Botiyivska Wind Farm have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Botiyivska Wind Farm?
- Which company designed the project for Botiyivska Wind Farm?
- Which company was the general contractor for Botiyivska Wind Farm?
- What generating equipment (wind turbines) is installed in Botiyivska Wind Farm?
- What is the size of the land plot on which Botiyivska Wind Farm is located?
- What are the cadastral numbers of the parcels on which Botiyivska Wind Farm is located?
- What are the exact coordinates of the location of Botiyivska Wind Farm?
- When were the grid connection specification forBotiyivska Wind Farm issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Botiyivska Wind Farm
- Land allocation documentationBotiyivska Wind Farm
- Construction permits and declarative documentationBotiyivska Wind Farm
- Environmental Impact Assessment (EIA) DocumentsBotiyivska Wind Farm
- Feed-In-Tariff Setting DocumentsBotiyivska Wind Farm
The presented list reflects the directions in which information on assets is collected. On the Botiyivska Wind Farm some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.