Description of the power plant
Hydroelectric power plant Chapayevska HPP is located in east part of Ukraine - Bershadskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 0.08 MW. Ltd "Podilska Enerhetychna Kompaniya" is a legal entity operating the power plant. It obtained the license for electricity generation on March 04, 2010 and permitted for the Feed-in-tariff in hryvnias equivalent of 19.39 eurocents starting from November 28, 2013.
Putted into opperation
Nov 2013
Installed capacity
0.08 MW
Feed-in-Tariff
19.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "YUVV-BUD"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Chapayevska HPP?
- What group of companies does the Chapayevska HPP belong to?
- Who are the beneficial owners of Chapayevska HPP?
- What is the current tariff in UAH for Chapayevska HPP?
- Is there a local component bonus for Chapayevska HPP and what is its size
- What is the capacity factor of Chapayevska HPP?
- What is the monthly electricity production of Chapayevska HPP?
- What is the annual revenue of Chapayevska HPP?
- What market share does Chapayevska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Chapayevska HPP?
- Which company designed the project for Chapayevska HPP?
- Which company was the general contractor for Chapayevska HPP?
- What is the size of the land plot on which Chapayevska HPP is located?
- What are the cadastral numbers of the parcels on which Chapayevska HPP is located?
- What are the exact coordinates of the location of Chapayevska HPP?
- When were the grid connection specification forChapayevska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Chapayevska HPP
- Land allocation documentationChapayevska HPP
- Construction permits and declarative documentationChapayevska HPP
- Environmental Impact Assessment (EIA) DocumentsChapayevska HPP
- Feed-In-Tariff Setting DocumentsChapayevska HPP
The presented list reflects the directions in which information on assets is collected. On the Chapayevska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.