Description of the power plant
Hydroelectric power plant Chernyatska HPP is located in east part of Ukraine - Bershadskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 1954 with installed capacity- 1.52 MW. Ltd "Yedynyy Enerhostandart" is a legal entity operating the power plant. It obtained the license for electricity generation on September 11, 2002 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.63 eurocents starting from August 01, 2009.
Putted into opperation
Mar 1954
Installed capacity
1.52 MW
Feed-in-Tariff
11.63¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Chernyatska HPP?
- What group of companies does the Chernyatska HPP belong to?
- Who are the beneficial owners of Chernyatska HPP?
- What is the current tariff in UAH for Chernyatska HPP?
- Is there a local component bonus for Chernyatska HPP and what is its size
- What is the capacity factor of Chernyatska HPP?
- What is the monthly electricity production of Chernyatska HPP?
- What is the annual revenue of Chernyatska HPP?
- What market share does Chernyatska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Chernyatska HPP?
- Which company designed the project for Chernyatska HPP?
- Which company was the general contractor for Chernyatska HPP?
- What is the size of the land plot on which Chernyatska HPP is located?
- What are the cadastral numbers of the parcels on which Chernyatska HPP is located?
- What are the exact coordinates of the location of Chernyatska HPP?
- When were the grid connection specification forChernyatska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Chernyatska HPP
- Land allocation documentationChernyatska HPP
- Construction permits and declarative documentationChernyatska HPP
- Environmental Impact Assessment (EIA) DocumentsChernyatska HPP
- Feed-In-Tariff Setting DocumentsChernyatska HPP
The presented list reflects the directions in which information on assets is collected. On the Chernyatska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.