CHP Yelyzavetivka

Description of the power plant

Biogas power plant CHP Yelyzavetivka is located in east part of Ukraine - Petrykivskyi district, Dnipropetrovska region, Ukraine. The power plant is putted into operation on 2013 with installed capacity- 5.69 MW. Pjsc "Oril-Lider" is a legal entity operating the power plant. It obtained the license for electricity generation on October 31, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from November 21, 2013.

PJSC "ORIL-LIDER"

Putted into opperation

Aug 2013

Installed capacity

5.69 MW

Feed-in-Tariff

12.39¢

Location

Petrykivskyi district, Dnipropetrovska region, Ukraine

Key Indicators

87.0%

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

5.692

Installed capacity

Installed capacity of the power plant (MW)

12.38

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

Equipment

Type Manufacturer Model
GE Jenbacher JMC 320 GS-B.L. 1063.0 4
GE Jenbacher JMS 420 GS-B.L 1480.0 1

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for CHP Yelyzavetivka

The presented list reflects the directions in which information on assets is collected. On the CHP Yelyzavetivka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001