Description of the power plant
Biogas power plant Cogeneration Unit Bazova 1 Stage is located in south part of Ukraine - Zaporizka city council, Zaporizka region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 2.13 MW. Ltd "Biohaz-Ukrayina" is a legal entity operating the power plant. It obtained the license for electricity generation on November 08, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from February 12, 2019.
Putted into opperation
Dec 2018
Installed capacity
2.13 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD NVO "TERMOSYSTEMY"General contractor
LTD "STROHAZ"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Cogeneration Unit Bazova 1 Stage?
- What group of companies does the Cogeneration Unit Bazova 1 Stage belong to?
- Who are the beneficial owners of Cogeneration Unit Bazova 1 Stage?
- What is the current tariff in UAH for Cogeneration Unit Bazova 1 Stage?
- Is there a local component bonus for Cogeneration Unit Bazova 1 Stage and what is its size
- What is the capacity factor of Cogeneration Unit Bazova 1 Stage?
- What is the monthly electricity production of Cogeneration Unit Bazova 1 Stage?
- What is the annual revenue of Cogeneration Unit Bazova 1 Stage?
- What market share does Cogeneration Unit Bazova 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Cogeneration Unit Bazova 1 Stage?
- Which company designed the project for Cogeneration Unit Bazova 1 Stage?
- Which company was the general contractor for Cogeneration Unit Bazova 1 Stage?
- What is the size of the land plot on which Cogeneration Unit Bazova 1 Stage is located?
- What are the cadastral numbers of the parcels on which Cogeneration Unit Bazova 1 Stage is located?
- What are the exact coordinates of the location of Cogeneration Unit Bazova 1 Stage?
- When were the grid connection specification forCogeneration Unit Bazova 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Cogeneration Unit Bazova 1 Stage
- Land allocation documentationCogeneration Unit Bazova 1 Stage
- Construction permits and declarative documentationCogeneration Unit Bazova 1 Stage
- Environmental Impact Assessment (EIA) DocumentsCogeneration Unit Bazova 1 Stage
- Feed-In-Tariff Setting DocumentsCogeneration Unit Bazova 1 Stage
The presented list reflects the directions in which information on assets is collected. On the Cogeneration Unit Bazova 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.