Description of the power plant
Biogas power plant Cogeneration Unit Rybnenska is located in west part of Ukraine - Tysmenytskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 0.66 MW. Ltd "Kliar Enerdzhi" is a legal entity operating the power plant. It obtained the license for electricity generation on June 30, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from April 28, 2017.
Putted into opperation
May 2017
Installed capacity
0.66 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "INZHENERHOPROEKT"General contractor
PNVP "SYNAPS"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
GE Jenbacher | JMC 208 GS-L.L. |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Cogeneration Unit Rybnenska?
- What group of companies does the Cogeneration Unit Rybnenska belong to?
- Who are the beneficial owners of Cogeneration Unit Rybnenska?
- What is the current tariff in UAH for Cogeneration Unit Rybnenska?
- Is there a local component bonus for Cogeneration Unit Rybnenska and what is its size
- What is the capacity factor of Cogeneration Unit Rybnenska?
- What is the monthly electricity production of Cogeneration Unit Rybnenska?
- What is the annual revenue of Cogeneration Unit Rybnenska?
- What market share does Cogeneration Unit Rybnenska have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Cogeneration Unit Rybnenska?
- Which company designed the project for Cogeneration Unit Rybnenska?
- Which company was the general contractor for Cogeneration Unit Rybnenska?
- What is the size of the land plot on which Cogeneration Unit Rybnenska is located?
- What are the cadastral numbers of the parcels on which Cogeneration Unit Rybnenska is located?
- What are the exact coordinates of the location of Cogeneration Unit Rybnenska?
- When were the grid connection specification forCogeneration Unit Rybnenska issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Cogeneration Unit Rybnenska
- Land allocation documentationCogeneration Unit Rybnenska
- Construction permits and declarative documentationCogeneration Unit Rybnenska
- Environmental Impact Assessment (EIA) DocumentsCogeneration Unit Rybnenska
- Feed-In-Tariff Setting DocumentsCogeneration Unit Rybnenska
The presented list reflects the directions in which information on assets is collected. On the Cogeneration Unit Rybnenska some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.