Description of the power plant
Biogas power plant Cogeneration Unit Teofipolska 2 Stage is located in west part of Ukraine - Teofipolskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 10.5 MW. Ltd "Teofipolska Enerhetychna Kompaniya" is a legal entity operating the power plant. It obtained the license for electricity generation on June 09, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from June 25, 2019.
Putted into opperation
Apr 2019
Installed capacity
10.5 MW
Feed-in-Tariff
12.39¢
+500% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC taking into account the premium for the local component - 500%
(eurocents/KWh)
Contractors
Designer
LTD "ZORH BIOHAZ UKRAYINA"General contractor
LTD "YAMAS-BUD"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Cogeneration Unit Teofipolska 2 Stage?
- What group of companies does the Cogeneration Unit Teofipolska 2 Stage belong to?
- Who are the beneficial owners of Cogeneration Unit Teofipolska 2 Stage?
- What is the current tariff in UAH for Cogeneration Unit Teofipolska 2 Stage?
- Is there a local component bonus for Cogeneration Unit Teofipolska 2 Stage and what is its size
- What is the capacity factor of Cogeneration Unit Teofipolska 2 Stage?
- What is the monthly electricity production of Cogeneration Unit Teofipolska 2 Stage?
- What is the annual revenue of Cogeneration Unit Teofipolska 2 Stage?
- What market share does Cogeneration Unit Teofipolska 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Cogeneration Unit Teofipolska 2 Stage?
- Which company designed the project for Cogeneration Unit Teofipolska 2 Stage?
- Which company was the general contractor for Cogeneration Unit Teofipolska 2 Stage?
- What is the size of the land plot on which Cogeneration Unit Teofipolska 2 Stage is located?
- What are the cadastral numbers of the parcels on which Cogeneration Unit Teofipolska 2 Stage is located?
- What are the exact coordinates of the location of Cogeneration Unit Teofipolska 2 Stage?
- When were the grid connection specification forCogeneration Unit Teofipolska 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Cogeneration Unit Teofipolska 2 Stage
- Land allocation documentationCogeneration Unit Teofipolska 2 Stage
- Construction permits and declarative documentationCogeneration Unit Teofipolska 2 Stage
- Environmental Impact Assessment (EIA) DocumentsCogeneration Unit Teofipolska 2 Stage
- Feed-In-Tariff Setting DocumentsCogeneration Unit Teofipolska 2 Stage
The presented list reflects the directions in which information on assets is collected. On the Cogeneration Unit Teofipolska 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.