Description of the power plant
Biogas power plant Cogeneration Unit Timiryazyeva is located in east part of Ukraine - Kremenchutska city council, Poltavska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 0.85 MW. Ltd "Kliar Enerdzhi-Kremenchuk" is a legal entity operating the power plant. It obtained the license for electricity generation on October 13, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 12.39 eurocents starting from January 11, 2018.
Putted into opperation
Nov 2017
Installed capacity
0.85 MW
Feed-in-Tariff
12.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "INZHENERHOPROEKT"General contractor
PNVP "SYNAPS"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
GE Jenbacher | JMS 420 GS-B.L |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Cogeneration Unit Timiryazyeva?
- What group of companies does the Cogeneration Unit Timiryazyeva belong to?
- Who are the beneficial owners of Cogeneration Unit Timiryazyeva?
- What is the current tariff in UAH for Cogeneration Unit Timiryazyeva?
- Is there a local component bonus for Cogeneration Unit Timiryazyeva and what is its size
- What is the capacity factor of Cogeneration Unit Timiryazyeva?
- What is the monthly electricity production of Cogeneration Unit Timiryazyeva?
- What is the annual revenue of Cogeneration Unit Timiryazyeva?
- What market share does Cogeneration Unit Timiryazyeva have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Cogeneration Unit Timiryazyeva?
- Which company designed the project for Cogeneration Unit Timiryazyeva?
- Which company was the general contractor for Cogeneration Unit Timiryazyeva?
- What is the size of the land plot on which Cogeneration Unit Timiryazyeva is located?
- What are the cadastral numbers of the parcels on which Cogeneration Unit Timiryazyeva is located?
- What are the exact coordinates of the location of Cogeneration Unit Timiryazyeva?
- When were the grid connection specification forCogeneration Unit Timiryazyeva issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Cogeneration Unit Timiryazyeva
- Land allocation documentationCogeneration Unit Timiryazyeva
- Construction permits and declarative documentationCogeneration Unit Timiryazyeva
- Environmental Impact Assessment (EIA) DocumentsCogeneration Unit Timiryazyeva
- Feed-In-Tariff Setting DocumentsCogeneration Unit Timiryazyeva
The presented list reflects the directions in which information on assets is collected. On the Cogeneration Unit Timiryazyeva some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.