Description of the power plant
Onshore wind farm Dmytrivska Wind Farm 1 3 Stages is located in south part of Ukraine - Ochakivskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2015 with installed capacity- 30.0 MW. Pjsc "Vitryanyy Park Ochakivskyy" is a legal entity operating the power plant. It obtained the license for electricity generation on November 28, 2011 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.31 eurocents starting from January 01, 2012.
Putted into opperation
Jul 2015
Installed capacity
30.0 MW
Feed-in-Tariff
11.31¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
"AVTOHRAF-N"General contractor
PJSC "BK"ZHYTLOPROMBUD-8"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Fuhrlander | FL 2500-100 |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Dmytrivska Wind Farm 1 3 Stages?
- What group of companies does the Dmytrivska Wind Farm 1 3 Stages belong to?
- Who are the beneficial owners of Dmytrivska Wind Farm 1 3 Stages?
- What is the wind speed at Dmytrivska Wind Farm 1 3 Stages?
- What is the current tariff in UAH for Dmytrivska Wind Farm 1 3 Stages?
- Is there a local component bonus for Dmytrivska Wind Farm 1 3 Stages and what is its size
- What is the capacity factor of Dmytrivska Wind Farm 1 3 Stages?
- What is the monthly electricity production of Dmytrivska Wind Farm 1 3 Stages?
- What is the annual revenue of Dmytrivska Wind Farm 1 3 Stages?
- What market share does Dmytrivska Wind Farm 1 3 Stages have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Dmytrivska Wind Farm 1 3 Stages?
- Which company designed the project for Dmytrivska Wind Farm 1 3 Stages?
- Which company was the general contractor for Dmytrivska Wind Farm 1 3 Stages?
- What generating equipment (wind turbines) is installed in Dmytrivska Wind Farm 1 3 Stages?
- What is the size of the land plot on which Dmytrivska Wind Farm 1 3 Stages is located?
- What are the cadastral numbers of the parcels on which Dmytrivska Wind Farm 1 3 Stages is located?
- What are the exact coordinates of the location of Dmytrivska Wind Farm 1 3 Stages?
- When were the grid connection specification forDmytrivska Wind Farm 1 3 Stages issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Dmytrivska Wind Farm 1 3 Stages
- Land allocation documentationDmytrivska Wind Farm 1 3 Stages
- Construction permits and declarative documentationDmytrivska Wind Farm 1 3 Stages
- Environmental Impact Assessment (EIA) DocumentsDmytrivska Wind Farm 1 3 Stages
- Feed-In-Tariff Setting DocumentsDmytrivska Wind Farm 1 3 Stages
The presented list reflects the directions in which information on assets is collected. On the Dmytrivska Wind Farm 1 3 Stages some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.