Description of the power plant
Ground-based solar power plant Dobrivlyanska PV Plant 2 is located in west part of Ukraine - Zalishchytskyi district, Ternopilska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 2.55 MW. Ltd "Fora S" is a legal entity operating the power plant. It obtained the license for electricity generation on October 25, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from September 28, 2018.
Putted into opperation
Aug 2018
Installed capacity
2.55 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
General contractor
PE "ART-ENERHO"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Dobrivlyanska PV Plant 2?
- What group of companies does the Dobrivlyanska PV Plant 2 belong to?
- Who are the beneficial owners of Dobrivlyanska PV Plant 2?
- What is the insolation at Dobrivlyanska PV Plant 2?
- What is the current tariff in UAH for Dobrivlyanska PV Plant 2?
- Is there a local component bonus for Dobrivlyanska PV Plant 2 and what is its size
- What is the capacity factor of Dobrivlyanska PV Plant 2?
- What is the monthly electricity production of Dobrivlyanska PV Plant 2?
- What is the annual revenue of Dobrivlyanska PV Plant 2?
- What market share does Dobrivlyanska PV Plant 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Dobrivlyanska PV Plant 2?
- Which company designed the project for Dobrivlyanska PV Plant 2?
- Which company was the general contractor for Dobrivlyanska PV Plant 2?
- What generating equipment (solar panels and inverters) is installed in Dobrivlyanska PV Plant 2?
- What is the size of the land plot on which Dobrivlyanska PV Plant 2 is located?
- What are the cadastral numbers of the parcels on which Dobrivlyanska PV Plant 2 is located?
- What are the exact coordinates of the location of Dobrivlyanska PV Plant 2?
- When were the grid connection specification forDobrivlyanska PV Plant 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Dobrivlyanska PV Plant 2
- Land allocation documentationDobrivlyanska PV Plant 2
- Construction permits and declarative documentationDobrivlyanska PV Plant 2
- Environmental Impact Assessment (EIA) DocumentsDobrivlyanska PV Plant 2
- Feed-In-Tariff Setting DocumentsDobrivlyanska PV Plant 2
The presented list reflects the directions in which information on assets is collected. On the Dobrivlyanska PV Plant 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.