Description of the power plant
Ground-based solar power plant Dymerska PV Plant 1 Stage is located in north part of Ukraine - Brovarskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 6.0 MW. Ltd "Dymerska Ses-1" is a legal entity operating the power plant. It obtained the license for electricity generation on July 05, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from July 27, 2017.
Putted into opperation
Jul 2017
Installed capacity
6.0 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "NTK "METROPOLIYA"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Dymerska PV Plant 1 Stage?
- What group of companies does the Dymerska PV Plant 1 Stage belong to?
- Who are the beneficial owners of Dymerska PV Plant 1 Stage?
- What is the insolation at Dymerska PV Plant 1 Stage?
- What is the current tariff in UAH for Dymerska PV Plant 1 Stage?
- Is there a local component bonus for Dymerska PV Plant 1 Stage and what is its size
- What is the capacity factor of Dymerska PV Plant 1 Stage?
- What is the monthly electricity production of Dymerska PV Plant 1 Stage?
- What is the annual revenue of Dymerska PV Plant 1 Stage?
- What market share does Dymerska PV Plant 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Dymerska PV Plant 1 Stage?
- Which company designed the project for Dymerska PV Plant 1 Stage?
- Which company was the general contractor for Dymerska PV Plant 1 Stage?
- What generating equipment (solar panels and inverters) is installed in Dymerska PV Plant 1 Stage?
- What is the size of the land plot on which Dymerska PV Plant 1 Stage is located?
- What are the cadastral numbers of the parcels on which Dymerska PV Plant 1 Stage is located?
- What are the exact coordinates of the location of Dymerska PV Plant 1 Stage?
- When were the grid connection specification forDymerska PV Plant 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Dymerska PV Plant 1 Stage
- Land allocation documentationDymerska PV Plant 1 Stage
- Construction permits and declarative documentationDymerska PV Plant 1 Stage
- Environmental Impact Assessment (EIA) DocumentsDymerska PV Plant 1 Stage
- Feed-In-Tariff Setting DocumentsDymerska PV Plant 1 Stage
The presented list reflects the directions in which information on assets is collected. On the Dymerska PV Plant 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.