Description of the power plant
Hydroelectric power plant Hayvoronska HPP is located in east part of Ukraine - Haivoronskyi district, Kirovohradska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 7.82 MW. Ltd "Hidroenerhoinvest" is a legal entity operating the power plant. It obtained the license for electricity generation on January 05, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.45 eurocents starting from March 01, 2012.
Putted into opperation
May 2017
Installed capacity
7.82 MW
Feed-in-Tariff
10.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HIDROINZHYNIRINH"General contractor
LTD "HIDROINZHYNIRINH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Hayvoronska HPP?
- What group of companies does the Hayvoronska HPP belong to?
- Who are the beneficial owners of Hayvoronska HPP?
- What is the current tariff in UAH for Hayvoronska HPP?
- Is there a local component bonus for Hayvoronska HPP and what is its size
- What is the capacity factor of Hayvoronska HPP?
- What is the monthly electricity production of Hayvoronska HPP?
- What is the annual revenue of Hayvoronska HPP?
- What market share does Hayvoronska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Hayvoronska HPP?
- Which company designed the project for Hayvoronska HPP?
- Which company was the general contractor for Hayvoronska HPP?
- What is the size of the land plot on which Hayvoronska HPP is located?
- What are the cadastral numbers of the parcels on which Hayvoronska HPP is located?
- What are the exact coordinates of the location of Hayvoronska HPP?
- When were the grid connection specification forHayvoronska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Hayvoronska HPP
- Land allocation documentationHayvoronska HPP
- Construction permits and declarative documentationHayvoronska HPP
- Environmental Impact Assessment (EIA) DocumentsHayvoronska HPP
- Feed-In-Tariff Setting DocumentsHayvoronska HPP
The presented list reflects the directions in which information on assets is collected. On the Hayvoronska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.