Description of the power plant
Hydroelectric power plant HPP Hidro Invest is located in north part of Ukraine - Bilotserkivskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.93 MW. Ltd "Hidro-Invest" is a legal entity operating the power plant. It obtained the license for electricity generation on October 24, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from January 28, 2020.
Putted into opperation
Dec 2019
Installed capacity
0.93 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HIDROBUD LTD"General contractor
LTD "SARASH STROY"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with HPP Hidro Invest?
- What group of companies does the HPP Hidro Invest belong to?
- Who are the beneficial owners of HPP Hidro Invest?
- What is the current tariff in UAH for HPP Hidro Invest?
- Is there a local component bonus for HPP Hidro Invest and what is its size
- What is the capacity factor of HPP Hidro Invest?
- What is the monthly electricity production of HPP Hidro Invest?
- What is the annual revenue of HPP Hidro Invest?
- What market share does HPP Hidro Invest have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for HPP Hidro Invest?
- Which company designed the project for HPP Hidro Invest?
- Which company was the general contractor for HPP Hidro Invest?
- What is the size of the land plot on which HPP Hidro Invest is located?
- What are the cadastral numbers of the parcels on which HPP Hidro Invest is located?
- What are the exact coordinates of the location of HPP Hidro Invest?
- When were the grid connection specification forHPP Hidro Invest issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for HPP Hidro Invest
- Land allocation documentationHPP Hidro Invest
- Construction permits and declarative documentationHPP Hidro Invest
- Environmental Impact Assessment (EIA) DocumentsHPP Hidro Invest
- Feed-In-Tariff Setting DocumentsHPP Hidro Invest
The presented list reflects the directions in which information on assets is collected. On the HPP Hidro Invest some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.