Description of the power plant
Hydroelectric power plant HPP Kapustyanka is located in south part of Ukraine - Zaporizka city council, Zaporizka region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 0.48 MW. Ltd "Hidropauer-1" is a legal entity operating the power plant. It obtained the license for electricity generation on July 10, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 13.95 eurocents starting from November 27, 2018.
Putted into opperation
Sep 2018
Installed capacity
0.48 MW
Feed-in-Tariff
13.95¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HIDROENERHETYKA"General contractor
LTD "SARASH STROY"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with HPP Kapustyanka?
- What group of companies does the HPP Kapustyanka belong to?
- Who are the beneficial owners of HPP Kapustyanka?
- What is the current tariff in UAH for HPP Kapustyanka?
- Is there a local component bonus for HPP Kapustyanka and what is its size
- What is the capacity factor of HPP Kapustyanka?
- What is the monthly electricity production of HPP Kapustyanka?
- What is the annual revenue of HPP Kapustyanka?
- What market share does HPP Kapustyanka have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for HPP Kapustyanka?
- Which company designed the project for HPP Kapustyanka?
- Which company was the general contractor for HPP Kapustyanka?
- What is the size of the land plot on which HPP Kapustyanka is located?
- What are the cadastral numbers of the parcels on which HPP Kapustyanka is located?
- What are the exact coordinates of the location of HPP Kapustyanka?
- When were the grid connection specification forHPP Kapustyanka issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for HPP Kapustyanka
- Land allocation documentationHPP Kapustyanka
- Construction permits and declarative documentationHPP Kapustyanka
- Environmental Impact Assessment (EIA) DocumentsHPP Kapustyanka
- Feed-In-Tariff Setting DocumentsHPP Kapustyanka
The presented list reflects the directions in which information on assets is collected. On the HPP Kapustyanka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.