Description of the power plant
Hydroelectric power plant HPP Orlove is located in east part of Ukraine - Novoarkhanhelskyi district, Kirovohradska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 0.18 MW. Ltd "Hidroenerhoinvest" is a legal entity operating the power plant. It obtained the license for electricity generation on January 05, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from January 17, 2020.
Putted into opperation
Dec 2019
Installed capacity
0.18 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HIDROINZHYNIRINH"General contractor
LTD "HIDROINZHYNIRINH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with HPP Orlove?
- What group of companies does the HPP Orlove belong to?
- Who are the beneficial owners of HPP Orlove?
- What is the current tariff in UAH for HPP Orlove?
- Is there a local component bonus for HPP Orlove and what is its size
- What is the capacity factor of HPP Orlove?
- What is the monthly electricity production of HPP Orlove?
- What is the annual revenue of HPP Orlove?
- What market share does HPP Orlove have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for HPP Orlove?
- Which company designed the project for HPP Orlove?
- Which company was the general contractor for HPP Orlove?
- What is the size of the land plot on which HPP Orlove is located?
- What are the cadastral numbers of the parcels on which HPP Orlove is located?
- What are the exact coordinates of the location of HPP Orlove?
- When were the grid connection specification forHPP Orlove issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for HPP Orlove
- Land allocation documentationHPP Orlove
- Construction permits and declarative documentationHPP Orlove
- Environmental Impact Assessment (EIA) DocumentsHPP Orlove
- Feed-In-Tariff Setting DocumentsHPP Orlove
The presented list reflects the directions in which information on assets is collected. On the HPP Orlove some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.