Description of the power plant
Hydroelectric power plant HPP Rudnya Horodyshche is located in east part of Ukraine - Zhytomyrskyi district, Zhytomyrska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 0.19 MW. Ltd "Svobodna Enerhiya" is a legal entity operating the power plant. It obtained the license for electricity generation on August 28, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from October 23, 2018.
Putted into opperation
Sep 2018
Installed capacity
0.19 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HIDROSTROM"General contractor
LTD "BUDINZHENERIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with HPP Rudnya Horodyshche?
- What group of companies does the HPP Rudnya Horodyshche belong to?
- Who are the beneficial owners of HPP Rudnya Horodyshche?
- What is the current tariff in UAH for HPP Rudnya Horodyshche?
- Is there a local component bonus for HPP Rudnya Horodyshche and what is its size
- What is the capacity factor of HPP Rudnya Horodyshche?
- What is the monthly electricity production of HPP Rudnya Horodyshche?
- What is the annual revenue of HPP Rudnya Horodyshche?
- What market share does HPP Rudnya Horodyshche have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for HPP Rudnya Horodyshche?
- Which company designed the project for HPP Rudnya Horodyshche?
- Which company was the general contractor for HPP Rudnya Horodyshche?
- What is the size of the land plot on which HPP Rudnya Horodyshche is located?
- What are the cadastral numbers of the parcels on which HPP Rudnya Horodyshche is located?
- What are the exact coordinates of the location of HPP Rudnya Horodyshche?
- When were the grid connection specification forHPP Rudnya Horodyshche issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for HPP Rudnya Horodyshche
- Land allocation documentationHPP Rudnya Horodyshche
- Construction permits and declarative documentationHPP Rudnya Horodyshche
- Environmental Impact Assessment (EIA) DocumentsHPP Rudnya Horodyshche
- Feed-In-Tariff Setting DocumentsHPP Rudnya Horodyshche
The presented list reflects the directions in which information on assets is collected. On the HPP Rudnya Horodyshche some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.