Description of the power plant
Hydroelectric power plant Knyshivska Mikro HPP is located in east part of Ukraine - Hadiatskyi district, Poltavska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 0.19 MW. Ltd "Enerhoaktyv-1" is a legal entity operating the power plant. It obtained the license for electricity generation on October 17, 2013 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.73 eurocents starting from January 20, 2021.
Putted into opperation
Sep 2020
Installed capacity
0.19 MW
Feed-in-Tariff
15.73¢
+20% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC taking into account the premium for the local component - 20%
(eurocents/KWh)
Contractors
Designer
LTD "INZHPROMBUDSERVIS"General contractor
LTD "PROFMONTAZH K"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Knyshivska Mikro HPP?
- What group of companies does the Knyshivska Mikro HPP belong to?
- Who are the beneficial owners of Knyshivska Mikro HPP?
- What is the current tariff in UAH for Knyshivska Mikro HPP?
- Is there a local component bonus for Knyshivska Mikro HPP and what is its size
- What is the capacity factor of Knyshivska Mikro HPP?
- What is the monthly electricity production of Knyshivska Mikro HPP?
- What is the annual revenue of Knyshivska Mikro HPP?
- What market share does Knyshivska Mikro HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Knyshivska Mikro HPP?
- Which company designed the project for Knyshivska Mikro HPP?
- Which company was the general contractor for Knyshivska Mikro HPP?
- What is the size of the land plot on which Knyshivska Mikro HPP is located?
- What are the cadastral numbers of the parcels on which Knyshivska Mikro HPP is located?
- What are the exact coordinates of the location of Knyshivska Mikro HPP?
- When were the grid connection specification forKnyshivska Mikro HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Knyshivska Mikro HPP
- Land allocation documentationKnyshivska Mikro HPP
- Construction permits and declarative documentationKnyshivska Mikro HPP
- Environmental Impact Assessment (EIA) DocumentsKnyshivska Mikro HPP
- Feed-In-Tariff Setting DocumentsKnyshivska Mikro HPP
The presented list reflects the directions in which information on assets is collected. On the Knyshivska Mikro HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.