Description of the power plant
Hydroelectric power plant Korostenska HPP is located in east part of Ukraine - Korostenskyi district, Zhytomyrska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 0.15 MW. Ltd "Kf "Slov’Yanska" is a legal entity operating the power plant. It obtained the license for electricity generation on March 13, 2014 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from March 13, 2014.
Putted into opperation
Dec 2016
Installed capacity
0.15 MW
Feed-in-Tariff
17.45¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
ME "ZHYTOMYRVODPROEKT"General contractor
LTD "ZIDAR"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Korostenska HPP?
- What group of companies does the Korostenska HPP belong to?
- Who are the beneficial owners of Korostenska HPP?
- What is the current tariff in UAH for Korostenska HPP?
- Is there a local component bonus for Korostenska HPP and what is its size
- What is the capacity factor of Korostenska HPP?
- What is the monthly electricity production of Korostenska HPP?
- What is the annual revenue of Korostenska HPP?
- What market share does Korostenska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Korostenska HPP?
- Which company designed the project for Korostenska HPP?
- Which company was the general contractor for Korostenska HPP?
- What is the size of the land plot on which Korostenska HPP is located?
- What are the cadastral numbers of the parcels on which Korostenska HPP is located?
- What are the exact coordinates of the location of Korostenska HPP?
- When were the grid connection specification forKorostenska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Korostenska HPP
- Land allocation documentationKorostenska HPP
- Construction permits and declarative documentationKorostenska HPP
- Environmental Impact Assessment (EIA) DocumentsKorostenska HPP
- Feed-In-Tariff Setting DocumentsKorostenska HPP
The presented list reflects the directions in which information on assets is collected. On the Korostenska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.