Description of the power plant
Hydroelectric power plant Krasnokhutirska HPP is located in east part of Ukraine - Vilshanskyi district, Kirovohradska region, Ukraine. The power plant has installed capacity- 3.6 MW. Ltd "Hidroenerhoinvest" is a legal entity operating the power plant. It obtained the license for electricity generation on January 05, 2012 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.63 eurocents starting from March 01, 2012.
Putted into opperation
N/A
Installed capacity
3.6 MW
Feed-in-Tariff
11.63¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Krasnokhutirska HPP?
- What group of companies does the Krasnokhutirska HPP belong to?
- Who are the beneficial owners of Krasnokhutirska HPP?
- What is the current tariff in UAH for Krasnokhutirska HPP?
- Is there a local component bonus for Krasnokhutirska HPP and what is its size
- What is the capacity factor of Krasnokhutirska HPP?
- What is the monthly electricity production of Krasnokhutirska HPP?
- What is the annual revenue of Krasnokhutirska HPP?
- What market share does Krasnokhutirska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Krasnokhutirska HPP?
- Which company designed the project for Krasnokhutirska HPP?
- Which company was the general contractor for Krasnokhutirska HPP?
- What is the size of the land plot on which Krasnokhutirska HPP is located?
- What are the cadastral numbers of the parcels on which Krasnokhutirska HPP is located?
- What are the exact coordinates of the location of Krasnokhutirska HPP?
- When were the grid connection specification forKrasnokhutirska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Krasnokhutirska HPP
- Land allocation documentationKrasnokhutirska HPP
- Construction permits and declarative documentationKrasnokhutirska HPP
- Environmental Impact Assessment (EIA) DocumentsKrasnokhutirska HPP
- Feed-In-Tariff Setting DocumentsKrasnokhutirska HPP
The presented list reflects the directions in which information on assets is collected. On the Krasnokhutirska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.