Description of the power plant
Hydroelectric power plant Lishchynska HPP is located in east part of Ukraine - Zhytomyrskyi district, Zhytomyrska region, Ukraine. The power plant is putted into operation on 2014 with installed capacity- 0.09 MW. Ltd "Zhytomyrkomunservis" is a legal entity operating the power plant. It obtained the license for electricity generation on June 19, 2014 and permitted for the Feed-in-tariff in hryvnias equivalent of 19.39 eurocents starting from October 16, 2014.
Putted into opperation
Aug 2014
Installed capacity
0.09 MW
Feed-in-Tariff
19.39¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
PE "PROSPEKT- PROEKT"General contractor
LTD "DZHI ES HRUP BUDIVNYTSTVO"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Lishchynska HPP?
- What group of companies does the Lishchynska HPP belong to?
- Who are the beneficial owners of Lishchynska HPP?
- What is the current tariff in UAH for Lishchynska HPP?
- Is there a local component bonus for Lishchynska HPP and what is its size
- What is the capacity factor of Lishchynska HPP?
- What is the monthly electricity production of Lishchynska HPP?
- What is the annual revenue of Lishchynska HPP?
- What market share does Lishchynska HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Lishchynska HPP?
- Which company designed the project for Lishchynska HPP?
- Which company was the general contractor for Lishchynska HPP?
- What is the size of the land plot on which Lishchynska HPP is located?
- What are the cadastral numbers of the parcels on which Lishchynska HPP is located?
- What are the exact coordinates of the location of Lishchynska HPP?
- When were the grid connection specification forLishchynska HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Lishchynska HPP
- Land allocation documentationLishchynska HPP
- Construction permits and declarative documentationLishchynska HPP
- Environmental Impact Assessment (EIA) DocumentsLishchynska HPP
- Feed-In-Tariff Setting DocumentsLishchynska HPP
The presented list reflects the directions in which information on assets is collected. On the Lishchynska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.