Description of the power plant
Onshore wind farm Lymanska Wind Farm 3 Stage is located in south part of Ukraine - Vitovskyi district, Mykolaivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 3.2 MW. Ltd "Vitryanyy Park Prychornomorskyy" is a legal entity operating the power plant. It obtained the license for electricity generation on October 20, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.18 eurocents starting from June 26, 2018.
Putted into opperation
May 2018
Installed capacity
3.2 MW
Feed-in-Tariff
10.18¢
+10% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC taking into account the premium for the local component - 10%
(eurocents/KWh)
Contractors
Designer
"AVTOHRAF-N"General contractor
PJSC "BK"ZHYTLOPROMBUD-8"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Lymanska Wind Farm 3 Stage?
- What group of companies does the Lymanska Wind Farm 3 Stage belong to?
- Who are the beneficial owners of Lymanska Wind Farm 3 Stage?
- What is the wind speed at Lymanska Wind Farm 3 Stage?
- What is the current tariff in UAH for Lymanska Wind Farm 3 Stage?
- Is there a local component bonus for Lymanska Wind Farm 3 Stage and what is its size
- What is the capacity factor of Lymanska Wind Farm 3 Stage?
- What is the monthly electricity production of Lymanska Wind Farm 3 Stage?
- What is the annual revenue of Lymanska Wind Farm 3 Stage?
- What market share does Lymanska Wind Farm 3 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Lymanska Wind Farm 3 Stage?
- Which company designed the project for Lymanska Wind Farm 3 Stage?
- Which company was the general contractor for Lymanska Wind Farm 3 Stage?
- What generating equipment (wind turbines) is installed in Lymanska Wind Farm 3 Stage?
- What is the size of the land plot on which Lymanska Wind Farm 3 Stage is located?
- What are the cadastral numbers of the parcels on which Lymanska Wind Farm 3 Stage is located?
- What are the exact coordinates of the location of Lymanska Wind Farm 3 Stage?
- When were the grid connection specification forLymanska Wind Farm 3 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Lymanska Wind Farm 3 Stage
- Land allocation documentationLymanska Wind Farm 3 Stage
- Construction permits and declarative documentationLymanska Wind Farm 3 Stage
- Environmental Impact Assessment (EIA) DocumentsLymanska Wind Farm 3 Stage
- Feed-In-Tariff Setting DocumentsLymanska Wind Farm 3 Stage
The presented list reflects the directions in which information on assets is collected. On the Lymanska Wind Farm 3 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.