Hydroelectric power plant Micro HPP Sayinka is located in east part of Ukraine - Chernivetskyi district, Vinnytska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 0.09 MW. Ltd "Nyu Enerdzhy" is a legal entity operating the power plant. It obtained the license for electricity generation on September 18, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.45 eurocents starting from November 27, 2018.

LTD "NYU ENERDZHY"

Putted into opperation

Oct 2018

Installed capacity

0.09 MW

Feed-in-Tariff

17.45¢

Location

Chernivetskyi district, Vinnytska region, Ukraine

Key Indicators

30.0%

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

0.09

Installed capacity

Installed capacity of the power plant (MW)

17.44

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for Micro HPP Sayinka

The presented list reflects the directions in which information on assets is collected. On the Micro HPP Sayinka some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001