Description of the power plant
Hydroelectric power plant Niverka HPP is located in west part of Ukraine - Kamianets-Podilskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 1957 with installed capacity- 0.8 MW. Ltd "Sibeks" is a legal entity operating the power plant. It obtained the license for electricity generation on June 02, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 13.95 eurocents starting from April 09, 2019.
Putted into opperation
Dec 1957
Installed capacity
0.8 MW
Feed-in-Tariff
13.95¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Installed capacity
Installed capacity of the power plant (MW)
Tariff
Tariff established by NERC
(eurocents/KWh)
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Niverka HPP?
- What group of companies does the Niverka HPP belong to?
- Who are the beneficial owners of Niverka HPP?
- What is the current tariff in UAH for Niverka HPP?
- Is there a local component bonus for Niverka HPP and what is its size
- What is the capacity factor of Niverka HPP?
- What is the monthly electricity production of Niverka HPP?
- What is the annual revenue of Niverka HPP?
- What market share does Niverka HPP have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Niverka HPP?
- Which company designed the project for Niverka HPP?
- Which company was the general contractor for Niverka HPP?
- What is the size of the land plot on which Niverka HPP is located?
- What are the cadastral numbers of the parcels on which Niverka HPP is located?
- What are the exact coordinates of the location of Niverka HPP?
- When were the grid connection specification forNiverka HPP issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Niverka HPP
- Land allocation documentationNiverka HPP
- Construction permits and declarative documentationNiverka HPP
- Environmental Impact Assessment (EIA) DocumentsNiverka HPP
- Feed-In-Tariff Setting DocumentsNiverka HPP
The presented list reflects the directions in which information on assets is collected. On the Niverka HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.