Novokostyantynivska HPP

Description of the power plant

Hydroelectric power plant Novokostyantynivska HPP is located in west part of Ukraine - Letychivskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2000 with installed capacity- 0.53 MW. Ltd Khmelnytskenerhozbut is a legal entity operating the power plant. It obtained the license for electricity generation on August 02, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.63 eurocents starting from June 16, 2021.

From May 2021 Novokostyantynivska HPP was changed to Novokostyantynivska HPP

LTD KHMELNYTSKENERHOZBUT

Putted into opperation

Jan 2000

Installed capacity

0.53 MW

Feed-in-Tariff

11.63¢

Location

Letychivskyi district, Khmelnytska region, Ukraine

Key Indicators

N/A

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

0.525

Installed capacity

Installed capacity of the power plant (MW)

11.63

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for Novokostyantynivska HPP

The presented list reflects the directions in which information on assets is collected. On the Novokostyantynivska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001