Pervomayska HPP

Description of the power plant

Hydroelectric power plant Pervomayska HPP is located in south part of Ukraine - Pervomaiska city council, Mykolaivska region, Ukraine. The power plant is putted into operation on 2021 with installed capacity- 2.14 MW. Ltd "Emza" is a legal entity operating the power plant. It obtained the license for electricity generation on March 03, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 9.42 eurocents starting from July 07, 2021.

LTD "EMZA"

Putted into opperation

Jun 2021

Installed capacity

2.14 MW

Feed-in-Tariff

9.42¢

Location

Pervomaiska city council, Mykolaivska region, Ukraine

Key Indicators

N/A

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

2.135

Installed capacity

Installed capacity of the power plant (MW)

9.42

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

Designer

LTD "VSEM"

General contractor

LTD "EMZA"

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for Pervomayska HPP

The presented list reflects the directions in which information on assets is collected. On the Pervomayska HPP some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001