Description of the power plant
Onshore wind farm Prymorska Wind Farm 2 25 26 Stages is located in south part of Ukraine - Pryazovskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 7.66 MW. Ltd «Dtek Prymorska Ves-2» is a legal entity operating the power plant. It obtained the license for electricity generation on July 09, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.18 eurocents starting from November 26, 2019.
Putted into opperation
Nov 2019
Installed capacity
7.66 MW
Feed-in-Tariff
10.18¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "TPF DONTEKHPROM"General contractor
LTD "BK "VIRA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
GE Wind Energy | GE 3.8-137 110 HH |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Prymorska Wind Farm 2 25 26 Stages?
- What group of companies does the Prymorska Wind Farm 2 25 26 Stages belong to?
- Who are the beneficial owners of Prymorska Wind Farm 2 25 26 Stages?
- What is the wind speed at Prymorska Wind Farm 2 25 26 Stages?
- What is the current tariff in UAH for Prymorska Wind Farm 2 25 26 Stages?
- Is there a local component bonus for Prymorska Wind Farm 2 25 26 Stages and what is its size
- What is the capacity factor of Prymorska Wind Farm 2 25 26 Stages?
- What is the monthly electricity production of Prymorska Wind Farm 2 25 26 Stages?
- What is the annual revenue of Prymorska Wind Farm 2 25 26 Stages?
- What market share does Prymorska Wind Farm 2 25 26 Stages have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Prymorska Wind Farm 2 25 26 Stages?
- Which company designed the project for Prymorska Wind Farm 2 25 26 Stages?
- Which company was the general contractor for Prymorska Wind Farm 2 25 26 Stages?
- What generating equipment (wind turbines) is installed in Prymorska Wind Farm 2 25 26 Stages?
- What is the size of the land plot on which Prymorska Wind Farm 2 25 26 Stages is located?
- What are the cadastral numbers of the parcels on which Prymorska Wind Farm 2 25 26 Stages is located?
- What are the exact coordinates of the location of Prymorska Wind Farm 2 25 26 Stages?
- When were the grid connection specification forPrymorska Wind Farm 2 25 26 Stages issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Prymorska Wind Farm 2 25 26 Stages
- Land allocation documentationPrymorska Wind Farm 2 25 26 Stages
- Construction permits and declarative documentationPrymorska Wind Farm 2 25 26 Stages
- Environmental Impact Assessment (EIA) DocumentsPrymorska Wind Farm 2 25 26 Stages
- Feed-In-Tariff Setting DocumentsPrymorska Wind Farm 2 25 26 Stages
The presented list reflects the directions in which information on assets is collected. On the Prymorska Wind Farm 2 25 26 Stages some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.