Description of the power plant
Onshore wind farm Prymorska Wind Farm 20 26 Stages is located in south part of Ukraine - Prymorskyi district, Zaporizka region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 26.81 MW. Ltd «Dtek Prymorska Ves» is a legal entity operating the power plant. It obtained the license for electricity generation on February 12, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 10.18 eurocents starting from April 12, 2019.
Putted into opperation
Mar 2019
Installed capacity
26.81 MW
Feed-in-Tariff
10.18¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Wind speed
Average annual wind speed for 10% windiest areas in 10 km area around wind farm location based on satellite data (m/s)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "TPF DONTEKHPROM"General contractor
LTD "BK "VIRA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
GE Wind Energy | GE 3.8-137 110 HH |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with Prymorska Wind Farm 20 26 Stages?
- What group of companies does the Prymorska Wind Farm 20 26 Stages belong to?
- Who are the beneficial owners of Prymorska Wind Farm 20 26 Stages?
- What is the wind speed at Prymorska Wind Farm 20 26 Stages?
- What is the current tariff in UAH for Prymorska Wind Farm 20 26 Stages?
- Is there a local component bonus for Prymorska Wind Farm 20 26 Stages and what is its size
- What is the capacity factor of Prymorska Wind Farm 20 26 Stages?
- What is the monthly electricity production of Prymorska Wind Farm 20 26 Stages?
- What is the annual revenue of Prymorska Wind Farm 20 26 Stages?
- What market share does Prymorska Wind Farm 20 26 Stages have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for Prymorska Wind Farm 20 26 Stages?
- Which company designed the project for Prymorska Wind Farm 20 26 Stages?
- Which company was the general contractor for Prymorska Wind Farm 20 26 Stages?
- What generating equipment (wind turbines) is installed in Prymorska Wind Farm 20 26 Stages?
- What is the size of the land plot on which Prymorska Wind Farm 20 26 Stages is located?
- What are the cadastral numbers of the parcels on which Prymorska Wind Farm 20 26 Stages is located?
- What are the exact coordinates of the location of Prymorska Wind Farm 20 26 Stages?
- When were the grid connection specification forPrymorska Wind Farm 20 26 Stages issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for Prymorska Wind Farm 20 26 Stages
- Land allocation documentationPrymorska Wind Farm 20 26 Stages
- Construction permits and declarative documentationPrymorska Wind Farm 20 26 Stages
- Environmental Impact Assessment (EIA) DocumentsPrymorska Wind Farm 20 26 Stages
- Feed-In-Tariff Setting DocumentsPrymorska Wind Farm 20 26 Stages
The presented list reflects the directions in which information on assets is collected. On the Prymorska Wind Farm 20 26 Stages some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.