PV Plant Bio Invest Hrupp 1

Description of the power plant

Ground-based solar power plant PV Plant Bio Invest Hrupp 1 is located in east part of Ukraine - Zolotoniskyi district, Cherkaska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 10.89 MW. Ltd "Bih-1" is a legal entity operating the power plant. It obtained the license for electricity generation on January 24, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 24, 2020.

LTD "BIH-1"

Putted into opperation

Dec 2019

Installed capacity

10.89 MW

DC

Feed-in-Tariff

15.03¢

Location

Zolotoniskyi district, Cherkaska region, Ukraine

Key Indicators

12.0%

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

1397

Irradiation

Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)

15.03

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Bio Invest Hrupp 1

The presented list reflects the directions in which information on assets is collected. On the PV Plant Bio Invest Hrupp 1 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,
Kyiv, 01001