Description of the power plant
Ground-based solar power plant PV Plant Blahovishchenska 1 Stage is located in east part of Ukraine - Blahovishchenskyi district, Kirovohradska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 2.72 MW. Ltd "Optimus Solar Enerdzhi" is a legal entity operating the power plant. It obtained the license for electricity generation on January 11, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from February 28, 2019.
Putted into opperation
Jan 2019
Installed capacity
2.72 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "DELA INZHYNIRYNH"General contractor
LTD "DELA INZHYNIRYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Blahovishchenska 1 Stage?
- What group of companies does the PV Plant Blahovishchenska 1 Stage belong to?
- Who are the beneficial owners of PV Plant Blahovishchenska 1 Stage?
- What is the insolation at PV Plant Blahovishchenska 1 Stage?
- What is the current tariff in UAH for PV Plant Blahovishchenska 1 Stage?
- Is there a local component bonus for PV Plant Blahovishchenska 1 Stage and what is its size
- What is the capacity factor of PV Plant Blahovishchenska 1 Stage?
- What is the monthly electricity production of PV Plant Blahovishchenska 1 Stage?
- What is the annual revenue of PV Plant Blahovishchenska 1 Stage?
- What market share does PV Plant Blahovishchenska 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Blahovishchenska 1 Stage?
- Which company designed the project for PV Plant Blahovishchenska 1 Stage?
- Which company was the general contractor for PV Plant Blahovishchenska 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Blahovishchenska 1 Stage?
- What is the size of the land plot on which PV Plant Blahovishchenska 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Blahovishchenska 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Blahovishchenska 1 Stage?
- When were the grid connection specification forPV Plant Blahovishchenska 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Blahovishchenska 1 Stage
- Land allocation documentationPV Plant Blahovishchenska 1 Stage
- Construction permits and declarative documentationPV Plant Blahovishchenska 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Blahovishchenska 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Blahovishchenska 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Blahovishchenska 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.