PV Plant Bohuslav 3 3 Stage

Description of the power plant

Ground-based solar power plant PV Plant Bohuslav 3 3 Stage is located in north part of Ukraine - Bohuslavskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 1.2 MW. Ltd "Solarpark" is a legal entity operating the power plant. It obtained the license for electricity generation on November 14, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from February 28, 2020.

LTD "SOLARPARK"

Putted into opperation

Dec 2019

Installed capacity

1.2 MW

DC

Feed-in-Tariff

15.03¢

Location

Bohuslavskyi district, Kyivska region, Ukraine

Key Indicators

13.0%

Capacity Factor

The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.

1386

Irradiation

Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)

15.03

Tariff

Tariff established by NERC
(eurocents/KWh)


a share of power plants with lower indicator value among all RES
a share of power plants with lower indicator value among power plants of the same type

Contractors

Additional information

In a paid subscription, you can additionally find answers to the following questions:

In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Bohuslav 3 3 Stage

The presented list reflects the directions in which information on assets is collected. On the PV Plant Bohuslav 3 3 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.

Have ideas to improve energo.ua?

Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.

In the system

1521

Assets

1332

Projects

4619

Companies

1A Sportyvna sq.,