Description of the power plant
Ground-based solar power plant PV Plant Bolhrad Elios is located in south part of Ukraine - Bolhradskyi district, Odeska region, Ukraine. The power plant is putted into operation on 2020 with installed capacity- 6.16 MW. Tov "Bolhrad Elios" is a legal entity operating the power plant. It obtained the license for electricity generation on February 07, 2020 and permitted for the Feed-in-tariff in hryvnias equivalent of 11.26 eurocents starting from February 21, 2020.
Putted into opperation
Jan 2020
Installed capacity
6.16 MW
DCFeed-in-Tariff
11.26¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "ELIOS STRATEHIYA"General contractor
LTD "ELIOS STRATEHIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Bolhrad Elios?
- What group of companies does the PV Plant Bolhrad Elios belong to?
- Who are the beneficial owners of PV Plant Bolhrad Elios?
- What is the insolation at PV Plant Bolhrad Elios?
- What is the current tariff in UAH for PV Plant Bolhrad Elios?
- Is there a local component bonus for PV Plant Bolhrad Elios and what is its size
- What is the capacity factor of PV Plant Bolhrad Elios?
- What is the monthly electricity production of PV Plant Bolhrad Elios?
- What is the annual revenue of PV Plant Bolhrad Elios?
- What market share does PV Plant Bolhrad Elios have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Bolhrad Elios?
- Which company designed the project for PV Plant Bolhrad Elios?
- Which company was the general contractor for PV Plant Bolhrad Elios?
- What generating equipment (solar panels and inverters) is installed in PV Plant Bolhrad Elios?
- What is the size of the land plot on which PV Plant Bolhrad Elios is located?
- What are the cadastral numbers of the parcels on which PV Plant Bolhrad Elios is located?
- What are the exact coordinates of the location of PV Plant Bolhrad Elios?
- When were the grid connection specification forPV Plant Bolhrad Elios issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Bolhrad Elios
- Land allocation documentationPV Plant Bolhrad Elios
- Construction permits and declarative documentationPV Plant Bolhrad Elios
- Environmental Impact Assessment (EIA) DocumentsPV Plant Bolhrad Elios
- Feed-In-Tariff Setting DocumentsPV Plant Bolhrad Elios
The presented list reflects the directions in which information on assets is collected. On the PV Plant Bolhrad Elios some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.