Description of the power plant
Rooftop solar power plant PV Plant Boryspilska 1 1 Stage is located in north part of Ukraine - Boryspilska city council, Kyivska region, Ukraine. The power plant is putted into operation on 2016 with installed capacity- 0.5 MW. Ltd "Sei Ukrayina" is a legal entity operating the power plant. It obtained the license for electricity generation on November 17, 2016 and permitted for the Feed-in-tariff in hryvnias equivalent of 17.23 eurocents starting from December 08, 2016.
Putted into opperation
Oct 2016
Installed capacity
0.5 MW
DCFeed-in-Tariff
17.23¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD SOLAR STALKONSTRUKTSIYAGeneral contractor
LTD "SOLAR STALKONSTRUKTSIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Boryspilska 1 1 Stage?
- What group of companies does the PV Plant Boryspilska 1 1 Stage belong to?
- Who are the beneficial owners of PV Plant Boryspilska 1 1 Stage?
- What is the insolation at PV Plant Boryspilska 1 1 Stage?
- What is the current tariff in UAH for PV Plant Boryspilska 1 1 Stage?
- Is there a local component bonus for PV Plant Boryspilska 1 1 Stage and what is its size
- What is the capacity factor of PV Plant Boryspilska 1 1 Stage?
- What is the monthly electricity production of PV Plant Boryspilska 1 1 Stage?
- What is the annual revenue of PV Plant Boryspilska 1 1 Stage?
- What market share does PV Plant Boryspilska 1 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Boryspilska 1 1 Stage?
- Which company designed the project for PV Plant Boryspilska 1 1 Stage?
- Which company was the general contractor for PV Plant Boryspilska 1 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Boryspilska 1 1 Stage?
- What is the size of the land plot on which PV Plant Boryspilska 1 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Boryspilska 1 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Boryspilska 1 1 Stage?
- When were the grid connection specification forPV Plant Boryspilska 1 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Boryspilska 1 1 Stage
- Land allocation documentationPV Plant Boryspilska 1 1 Stage
- Construction permits and declarative documentationPV Plant Boryspilska 1 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Boryspilska 1 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Boryspilska 1 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Boryspilska 1 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.