Description of the power plant
Ground-based solar power plant PV Plant Brylivka 1 Stage is located in south part of Ukraine - Oleshkivskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 4.85 MW. Ltd "Yush-Brylivka" is a legal entity operating the power plant. It obtained the license for electricity generation on September 25, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from November 27, 2018.
Putted into opperation
Oct 2018
Installed capacity
4.85 MW
DCFeed-in-Tariff
15.03¢
+5% bonusLocation
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC taking into account the premium for the local component - 5%
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "YUSH-BRYLIVKA"Equipment
Type | Manufacturer | Model | ||
---|---|---|---|---|
Q-Power | G5-270 Wp |
Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Brylivka 1 Stage?
- What group of companies does the PV Plant Brylivka 1 Stage belong to?
- Who are the beneficial owners of PV Plant Brylivka 1 Stage?
- What is the insolation at PV Plant Brylivka 1 Stage?
- What is the current tariff in UAH for PV Plant Brylivka 1 Stage?
- Is there a local component bonus for PV Plant Brylivka 1 Stage and what is its size
- What is the capacity factor of PV Plant Brylivka 1 Stage?
- What is the monthly electricity production of PV Plant Brylivka 1 Stage?
- What is the annual revenue of PV Plant Brylivka 1 Stage?
- What market share does PV Plant Brylivka 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Brylivka 1 Stage?
- Which company designed the project for PV Plant Brylivka 1 Stage?
- Which company was the general contractor for PV Plant Brylivka 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Brylivka 1 Stage?
- What is the size of the land plot on which PV Plant Brylivka 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Brylivka 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Brylivka 1 Stage?
- When were the grid connection specification forPV Plant Brylivka 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Brylivka 1 Stage
- Land allocation documentationPV Plant Brylivka 1 Stage
- Construction permits and declarative documentationPV Plant Brylivka 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Brylivka 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Brylivka 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Brylivka 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.