Description of the power plant
Ground-based solar power plant PV Plant Chernelytsya is located in west part of Ukraine - Horodenkivskyi district, Ivano-Frankivska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 5.57 MW. Ltd "Alfa-Enerhiya" is a legal entity operating the power plant. It obtained the license for electricity generation on June 26, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from September 18, 2018.
Putted into opperation
Jul 2018
Installed capacity
5.57 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "RENTEKO"General contractor
LTD "SOLAR STALKONSTRUKTSIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Chernelytsya?
- What group of companies does the PV Plant Chernelytsya belong to?
- Who are the beneficial owners of PV Plant Chernelytsya?
- What is the insolation at PV Plant Chernelytsya?
- What is the current tariff in UAH for PV Plant Chernelytsya?
- Is there a local component bonus for PV Plant Chernelytsya and what is its size
- What is the capacity factor of PV Plant Chernelytsya?
- What is the monthly electricity production of PV Plant Chernelytsya?
- What is the annual revenue of PV Plant Chernelytsya?
- What market share does PV Plant Chernelytsya have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Chernelytsya?
- Which company designed the project for PV Plant Chernelytsya?
- Which company was the general contractor for PV Plant Chernelytsya?
- What generating equipment (solar panels and inverters) is installed in PV Plant Chernelytsya?
- What is the size of the land plot on which PV Plant Chernelytsya is located?
- What are the cadastral numbers of the parcels on which PV Plant Chernelytsya is located?
- What are the exact coordinates of the location of PV Plant Chernelytsya?
- When were the grid connection specification forPV Plant Chernelytsya issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Chernelytsya
- Land allocation documentationPV Plant Chernelytsya
- Construction permits and declarative documentationPV Plant Chernelytsya
- Environmental Impact Assessment (EIA) DocumentsPV Plant Chernelytsya
- Feed-In-Tariff Setting DocumentsPV Plant Chernelytsya
The presented list reflects the directions in which information on assets is collected. On the PV Plant Chernelytsya some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.