Description of the power plant
Ground-based solar power plant PV Plant Chervona Hora Eko 2 is located in west part of Ukraine - Mukachivskyi district, Zakarpatska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 11.5 MW. Ltd "Chervona Hora Eko" is a legal entity operating the power plant. It obtained the license for electricity generation on November 26, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from November 26, 2019.
Putted into opperation
Oct 2019
Installed capacity
11.5 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "HELIOS STRATEHIYA"General contractor
LTD "HELIOS STRATEHIYA"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Chervona Hora Eko 2?
- What group of companies does the PV Plant Chervona Hora Eko 2 belong to?
- Who are the beneficial owners of PV Plant Chervona Hora Eko 2?
- What is the insolation at PV Plant Chervona Hora Eko 2?
- What is the current tariff in UAH for PV Plant Chervona Hora Eko 2?
- Is there a local component bonus for PV Plant Chervona Hora Eko 2 and what is its size
- What is the capacity factor of PV Plant Chervona Hora Eko 2?
- What is the monthly electricity production of PV Plant Chervona Hora Eko 2?
- What is the annual revenue of PV Plant Chervona Hora Eko 2?
- What market share does PV Plant Chervona Hora Eko 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Chervona Hora Eko 2?
- Which company designed the project for PV Plant Chervona Hora Eko 2?
- Which company was the general contractor for PV Plant Chervona Hora Eko 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Chervona Hora Eko 2?
- What is the size of the land plot on which PV Plant Chervona Hora Eko 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Chervona Hora Eko 2 is located?
- What are the exact coordinates of the location of PV Plant Chervona Hora Eko 2?
- When were the grid connection specification forPV Plant Chervona Hora Eko 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Chervona Hora Eko 2
- Land allocation documentationPV Plant Chervona Hora Eko 2
- Construction permits and declarative documentationPV Plant Chervona Hora Eko 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Chervona Hora Eko 2
- Feed-In-Tariff Setting DocumentsPV Plant Chervona Hora Eko 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Chervona Hora Eko 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.