Description of the power plant
Ground-based solar power plant PV Plant Derazhnya 2 is located in west part of Ukraine - Derazhnianskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 3.99 MW. Ltd "Sonyachna Derazhnya" is a legal entity operating the power plant. It obtained the license for electricity generation on January 27, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from June 26, 2018.
Putted into opperation
May 2018
Installed capacity
3.99 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "RODYNA INZHYNIRINH"General contractor
LTD "RODYNA ERS"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Derazhnya 2?
- What group of companies does the PV Plant Derazhnya 2 belong to?
- Who are the beneficial owners of PV Plant Derazhnya 2?
- What is the insolation at PV Plant Derazhnya 2?
- What is the current tariff in UAH for PV Plant Derazhnya 2?
- Is there a local component bonus for PV Plant Derazhnya 2 and what is its size
- What is the capacity factor of PV Plant Derazhnya 2?
- What is the monthly electricity production of PV Plant Derazhnya 2?
- What is the annual revenue of PV Plant Derazhnya 2?
- What market share does PV Plant Derazhnya 2 have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Derazhnya 2?
- Which company designed the project for PV Plant Derazhnya 2?
- Which company was the general contractor for PV Plant Derazhnya 2?
- What generating equipment (solar panels and inverters) is installed in PV Plant Derazhnya 2?
- What is the size of the land plot on which PV Plant Derazhnya 2 is located?
- What are the cadastral numbers of the parcels on which PV Plant Derazhnya 2 is located?
- What are the exact coordinates of the location of PV Plant Derazhnya 2?
- When were the grid connection specification forPV Plant Derazhnya 2 issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Derazhnya 2
- Land allocation documentationPV Plant Derazhnya 2
- Construction permits and declarative documentationPV Plant Derazhnya 2
- Environmental Impact Assessment (EIA) DocumentsPV Plant Derazhnya 2
- Feed-In-Tariff Setting DocumentsPV Plant Derazhnya 2
The presented list reflects the directions in which information on assets is collected. On the PV Plant Derazhnya 2 some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.