Description of the power plant
Ground-based solar power plant PV Plant Dobrobud Enerdzhi is located in north part of Ukraine - Bohuslavskyi district, Kyivska region, Ukraine. The power plant is putted into operation on 2019 with installed capacity- 1.87 MW. Tov "Dobrobud Invest" is a legal entity operating the power plant. It obtained the license for electricity generation on December 17, 2019 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 14, 2020.
Putted into opperation
Dec 2019
Installed capacity
1.87 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "EDS-INZHYNIRYNH"General contractor
LTD "DOBROBUD INVEST"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Dobrobud Enerdzhi?
- What group of companies does the PV Plant Dobrobud Enerdzhi belong to?
- Who are the beneficial owners of PV Plant Dobrobud Enerdzhi?
- What is the insolation at PV Plant Dobrobud Enerdzhi?
- What is the current tariff in UAH for PV Plant Dobrobud Enerdzhi?
- Is there a local component bonus for PV Plant Dobrobud Enerdzhi and what is its size
- What is the capacity factor of PV Plant Dobrobud Enerdzhi?
- What is the monthly electricity production of PV Plant Dobrobud Enerdzhi?
- What is the annual revenue of PV Plant Dobrobud Enerdzhi?
- What market share does PV Plant Dobrobud Enerdzhi have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Dobrobud Enerdzhi?
- Which company designed the project for PV Plant Dobrobud Enerdzhi?
- Which company was the general contractor for PV Plant Dobrobud Enerdzhi?
- What generating equipment (solar panels and inverters) is installed in PV Plant Dobrobud Enerdzhi?
- What is the size of the land plot on which PV Plant Dobrobud Enerdzhi is located?
- What are the cadastral numbers of the parcels on which PV Plant Dobrobud Enerdzhi is located?
- What are the exact coordinates of the location of PV Plant Dobrobud Enerdzhi?
- When were the grid connection specification forPV Plant Dobrobud Enerdzhi issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Dobrobud Enerdzhi
- Land allocation documentationPV Plant Dobrobud Enerdzhi
- Construction permits and declarative documentationPV Plant Dobrobud Enerdzhi
- Environmental Impact Assessment (EIA) DocumentsPV Plant Dobrobud Enerdzhi
- Feed-In-Tariff Setting DocumentsPV Plant Dobrobud Enerdzhi
The presented list reflects the directions in which information on assets is collected. On the PV Plant Dobrobud Enerdzhi some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.