Description of the power plant
Rooftop solar power plant PV Plant Dolynske 1 Stage is located in south part of Ukraine - Chaplynskyi district, Khersonska region, Ukraine. The power plant is putted into operation on 2018 with installed capacity- 2.27 MW. Ltd "Mv Alyans" is a legal entity operating the power plant. It obtained the license for electricity generation on February 09, 2018 and permitted for the Feed-in-tariff in hryvnias equivalent of 16.37 eurocents starting from June 12, 2018.
Putted into opperation
Mar 2018
Installed capacity
2.27 MW
DCFeed-in-Tariff
16.37¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD "PODILSKYY ENERHOKONSALTYNH"General contractor
LTD "PODILSKYY ENERHOKONSALTYNH"Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Dolynske 1 Stage?
- What group of companies does the PV Plant Dolynske 1 Stage belong to?
- Who are the beneficial owners of PV Plant Dolynske 1 Stage?
- What is the insolation at PV Plant Dolynske 1 Stage?
- What is the current tariff in UAH for PV Plant Dolynske 1 Stage?
- Is there a local component bonus for PV Plant Dolynske 1 Stage and what is its size
- What is the capacity factor of PV Plant Dolynske 1 Stage?
- What is the monthly electricity production of PV Plant Dolynske 1 Stage?
- What is the annual revenue of PV Plant Dolynske 1 Stage?
- What market share does PV Plant Dolynske 1 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Dolynske 1 Stage?
- Which company designed the project for PV Plant Dolynske 1 Stage?
- Which company was the general contractor for PV Plant Dolynske 1 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Dolynske 1 Stage?
- What is the size of the land plot on which PV Plant Dolynske 1 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Dolynske 1 Stage is located?
- What are the exact coordinates of the location of PV Plant Dolynske 1 Stage?
- When were the grid connection specification forPV Plant Dolynske 1 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Dolynske 1 Stage
- Land allocation documentationPV Plant Dolynske 1 Stage
- Construction permits and declarative documentationPV Plant Dolynske 1 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Dolynske 1 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Dolynske 1 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Dolynske 1 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.