Description of the power plant
Ground-based solar power plant PV Plant Dunayivtsi 2 Stage is located in west part of Ukraine - Dunaievetskyi district, Khmelnytska region, Ukraine. The power plant is putted into operation on 2017 with installed capacity- 5.0 MW. Ltd "Ekotekhnik-Dunayivtsi" is a legal entity operating the power plant. It obtained the license for electricity generation on January 27, 2017 and permitted for the Feed-in-tariff in hryvnias equivalent of 15.03 eurocents starting from January 11, 2018.
Putted into opperation
Nov 2017
Installed capacity
5.0 MW
DCFeed-in-Tariff
15.03¢
Location
Key Indicators
Capacity Factor
The unitless ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.
Irradiation
Average annual sum of global irradiation per square meter received by the modules of the given system based on satellite data (kWh/m2)
Tariff
Tariff established by NERC
(eurocents/KWh)
Contractors
Designer
LTD ""RODINA ENERDZHI HRUP""General contractor
LTD ""RODINA ENERDZHI HRUP""Additional information
In a paid subscription, you can additionally find answers to the following questions:
- What phone and email for contacts with PV Plant Dunayivtsi 2 Stage?
- What group of companies does the PV Plant Dunayivtsi 2 Stage belong to?
- Who are the beneficial owners of PV Plant Dunayivtsi 2 Stage?
- What is the insolation at PV Plant Dunayivtsi 2 Stage?
- What is the current tariff in UAH for PV Plant Dunayivtsi 2 Stage?
- Is there a local component bonus for PV Plant Dunayivtsi 2 Stage and what is its size
- What is the capacity factor of PV Plant Dunayivtsi 2 Stage?
- What is the monthly electricity production of PV Plant Dunayivtsi 2 Stage?
- What is the annual revenue of PV Plant Dunayivtsi 2 Stage?
- What market share does PV Plant Dunayivtsi 2 Stage have in the Ukrainian renewable energy market in terms of capacity, production and revenue?
- What was the capital expenditure cost for PV Plant Dunayivtsi 2 Stage?
- Which company designed the project for PV Plant Dunayivtsi 2 Stage?
- Which company was the general contractor for PV Plant Dunayivtsi 2 Stage?
- What generating equipment (solar panels and inverters) is installed in PV Plant Dunayivtsi 2 Stage?
- What is the size of the land plot on which PV Plant Dunayivtsi 2 Stage is located?
- What are the cadastral numbers of the parcels on which PV Plant Dunayivtsi 2 Stage is located?
- What are the exact coordinates of the location of PV Plant Dunayivtsi 2 Stage?
- When were the grid connection specification forPV Plant Dunayivtsi 2 Stage issued and what capacity was approved in the specification?
In addition, with a paid subscription, you can familiarize yourself with the available permits for PV Plant Dunayivtsi 2 Stage
- Land allocation documentationPV Plant Dunayivtsi 2 Stage
- Construction permits and declarative documentationPV Plant Dunayivtsi 2 Stage
- Environmental Impact Assessment (EIA) DocumentsPV Plant Dunayivtsi 2 Stage
- Feed-In-Tariff Setting DocumentsPV Plant Dunayivtsi 2 Stage
The presented list reflects the directions in which information on assets is collected. On the PV Plant Dunayivtsi 2 Stage some of this information may not yet be available, however, work is underway to collect the missing information and expand the amount of information provided to customers of a subscription.
Have ideas to improve energo.ua?
Energo.ua project is dedicated to add transparancy to Ukrainian renewable energy market.